November 2026 on Cercanías Rodalies de Catalunya

Monthly report generated automatically from the data we record every day.

Report data (JSON)

Partial report: the month has not ended yet. It covers 1 Nov to 2 Nov, with data on 2 of 30 days.

Summary of the month

On time
45 %
Mean delay
+11 min
More than 30 min late
49
Trains counted
661
Cancellations recorded
27

Punctuality each day

Share of trains on time; the dashed line marks 90%. A dot: a day with no data.

050901001 Nov: 45% on time12 Nov: 17% on time
Show each day's data as a table
DayOn timeTrainsOver 30 min
1 Nov45 %65546
2 Nov (today, partial)17 %63

Lines with the worst and best punctuality

Worst punctuality

Best punctuality

Only lines and products with at least 30 trains with delay data in the month.

Cancellations

27 trains marked as cancelled by Renfe in its open data.

  • R7: 14
  • R2N: 3
  • R1: 3
  • R4: 3
  • R11: 2
  • R2S: 2

We have recorded cancellations since 1 Nov. Each train is counted once a day, even if Renfe publishes it many times.

How it is calculated

For each train we take the last delay Renfe published while it was reporting its position; on time means arriving within 5 minutes. This is not Renfe's official punctuality. Not every train is included: only those that publish their position. Records since 1 Nov. Source: Renfe Data (data.renfe.com), CC BY 4.0.